So I just figured out this silly blog thing. I was definately having a lot of trouble logging onto it and was just able to log on. So I am working on both my zinc print and linoleum trying to catch up to the rest of the class and it is really hard. It is really hard considering i have to come up with a different drawing for my linoleum on paper and then put it on the actual linoleum so I have something to help me. Uh, it really is stressing. But, thats all I have for now.
Slade Grund
Wednesday, September 16, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment